杭州云戈企业咨询有限公司

体系认证
  • 作者:
  • 来源:
  • 日期: 2013-10-19
  • 浏览次数: 699


3.0 Incoming Materials Control进料控制
3.0.1 Proper first in-first out (FIFO) system on materials are
practiced.物料实施先进先出(FIFO)体系。
3.0.2 Factory has procedures for quality inspection on incoming raw
materials, accessories and components. 工厂有对进仓原物料、配件和部件质量检验的程序。
3.0.3 Incoming and outgoing material quantities are monitored and
documented. 进料和出货的物料的数量进行监测和记录。
3.2.4 Factory has specifications for purchased materials.
工厂有采购物料规范。
3.2.5 Factory has documented process and reference samples that
ensure incoming raw materials conform to specifications.
工厂有文件程序和参考样品以确保进仓原料符合规格。
3.2.6 (Critical) Factory has proper system on material segregation
to avoid accidental contamination from rejected items.
(重要)工厂已适当的对物料隔离体系,不合格的项目隔离以避免意外污染,
3.2.7 Factory properly separate good quality items from rejects and
identifies non-conforming (rejects) materials for replacement.
工厂适当隔离良品(不良品),并确定不良品(拒绝)更换。
3.2.8 Facility’s storage areas have sufficient lighting, well
ventilated and clean surrounding. 厂房的存储区域周围有足够的照明、通风和清洁。
3.0.9 Materials, components and accessories are properly stacked
and identified with tags / labels and off the floor.
材料、部件和配件的妥善堆放并有标记/标签并与地板隔离。
3.0.10 (Critical) Chemicals and maintenance substances are properly
marked and stored to prevent risk of contamination.
(重要)化学品和维修的物质妥善标识和储存,以防止污染的风险。
3.0.11 Color relevant materials such as fabrics, genuine leather
and synthetic PU/ PVC, trims and accessories are sorted by lot
numbers. 颜色有关的材料如布料、真皮及合成聚氨酯/聚氯乙烯、装饰及配件按批号储存。

 

上一篇: BSCI验厂
友情链接

验厂|验厂咨询|验厂辅导|认证咨询

版权所有:杭州云戈企业管理咨询有限公司 24小时咨询热线:18858134040

地址:杭州市余杭区南苑街道东湖南路凤仪家园1#楼146#
技术支持:

本站部分图文来源网络,如有侵权问题请通知我们处理!
维护
 

 
 
排列三跨度走势图 排列5走势图带连线 排列5和值走势图 西甲足彩 红包猎手 11选5技巧 3d走势300期 天天斗牛 懂球帝 懂球帝 足彩310 叉叉电竞 福彩3D助手 辰龙游戏 吉祥游戏 福彩3D游戏规则 大乐透游戏规则 秒速赛车_永久网址9h123.com - 水立方冰场转换结构上午完工-中新网 上海快3 安徽11选5走势图 北京快3走势图 江西快3 新疆11选5 海南4+1 浙江快乐12 江西11选5走势图 江西快3走势图 广西11选5走势图 澳门AG 篮球比分 山东群英会走势图 360彩票网 虎扑足球